💰 ECONOMIC MIX DESIGN · IS 10262:2019 · 2026 INDIAN MARKET RATES
Cost Optimization Tool
Find the most economical IS 10262-compliant concrete mix — compare materials, quantify superplasticiser ROI, evaluate SCM substitution savings, and run sensitivity analysis across all grades
📈 SP vs Cement Trade-off
🌿 SCM Substitution Economics
🔢 Multi-Grade Comparison
⚙️ Sensitivity Analysis
💰Material Unit Prices — 2026 Indian Market
Enter your project-specific or regional prices. Defaults are typical 2026 ex-plant/delivered rates for major Indian markets.
Binder & Water Prices
Aggregate & Admixture Prices
2026 Indian Market Rate Ranges (ex-plant / delivered): OPC 53 ₹5,200–5,800/t · PPC ₹4,500–5,200/t · PSC ₹4,800–5,400/t · River Sand ₹1,200–2,200/t · Crushed Stone ₹900–1,500/t · NSF SP ₹18–32/L · PCE SP ₹55–85/L · Fly Ash ₹400–1,200/t · GGBS ₹2,200–3,500/t · Silica Fume ₹15,000–22,000/t
📈Multi-Grade Material Cost Comparison
Compare total material cost per m³ for M20–M60 across OPC 53, PPC, and OPC 53 + SCMs at IS 10262 design quantities
📈 Material Cost per m³ — All Grades Comparison
| Grade | OPC 53 (₹/m³) | PPC (₹/m³) | OPC 53 + 25% FA (₹/m³) | OPC 53 + 40% GGBS (₹/m³) | Best Option | Saving vs OPC 53 |
|---|
📈Superplasticiser ROI — Dose vs Cement Saving
Quantify the economic case for SP at any grade — water reduction → cement reduction → net cost saving per m³
PCE liquid ≈ 1.06; NSF ≈ 1.20
📈 SP Dose vs Net Cost Saving per m³
| SP Dose (% cement) | SP Volume (L/m³) | Water Reduction (%) | Water Saved (L/m³) | Cement Saved (kg/m³) | SP Cost (₹/m³) | Cement Saving (₹/m³) | Net Saving (₹/m³) | ROI |
|---|
🌿SCM Substitution Economics
Compare cost per m³ at any concrete grade as fly ash, GGBS, or silica fume replaces OPC — accounting for IS 10262 k-factor efficiency and SP requirements
🌿 SCM Substitution — Cost vs Replacement Level
| SCM Replacement (%) | OPC (kg/m³) | SCM (kg/m³) | Effective w/c | IS 456 Compliant? | Binder Cost (₹/m³) | Total Mat. Cost (₹/m³) | Saving vs OPC-only |
|---|
🔢Custom Mix Cost Breakdown
Enter any mix design quantities and get a full itemised cost breakdown per m³ and per project volume
🔢 Itemised Cost Breakdown per m³
⚙️Sensitivity Analysis — Price Impact on m³ Cost
See how ±20% and ±50% changes in each material price affect the total cost of a reference M30 OPC 53 mix design
⚙️ Sensitivity Analysis — Impact of ±Price Changes on Total m³ Cost
—