IS 10262:2019 Table 1 – Standard Deviation Values for Concrete Mix Design Reference Chart 2026
When establishing a mix design for a new project or new materials — before 30 or more cube results are available — IS 10262:2019 Table 1 prescribes assumed standard deviation values based on grade and site control level. These are the values to use in the calculator until sufficient site data is available to calculate an actual SD. Reference: IS 10262:2019 Clause 5.3 and Table 1.
← Scroll horizontally to view all columns →
| Concrete Grade | Control Level | Assumed SD – S (MPa) | Target Mean Strength f'cr (MPa) | Margin Above fck (MPa) | Cement Penalty vs Excellent Control | Applicable Site Conditions |
|---|---|---|---|---|---|---|
| M10 – M35 | Very Good | 3.5 MPa | fck + 5.78 | +5.78 MPa | Baseline | Dedicated QC staff; calibrated plant; continuous SPC; NABL lab |
| Good | 4.0 MPa | fck + 6.60 | +6.60 MPa | +15–20 kg/m³ cement | Experienced crew; weigh-batching; regular cube testing; good supervision | |
| M40 and above | Very Good | 4.0 MPa | fck + 6.60 | +6.60 MPa | Baseline (HPC) | HPC/RMC plant; full-time concrete technologist; NABL lab; SPC charts |
| Good | 5.0 MPa | fck + 8.25 | +8.25 MPa | +20–30 kg/m³ cement | Standard batching plant; experienced supervisor; M40+ site batching |
IS 10262:2019 Table 1 — Key Rules for Using Assumed SD Values
- Minimum Data Requirement: Use assumed SD values only when fewer than 30 cube results are available from the current project with current materials. Once you have 30+ results, calculate the actual SD and update the mix design
- Conservative Approach: If you are uncertain about the level of control achievable on site, use the higher SD value (Good control) rather than Very Good. It is safer to over-design slightly than to produce defective concrete
- Grade Boundary: The grade boundary is at M35/M40. Use the M10–M35 row for all grades up to and including M35; use the M40+ row for M40, M45, M50, and above
- Not for High-Strength Design: For M70+ and UHPC where w/c ≤ 0.28, the assumed SD values in Table 1 are insufficient. Use specialist plant data or conduct a statistical study of the production process
- RMC Production: RMC plants with established 6-month+ production records and continuous statistical monitoring typically achieve S = 3.0–3.5 MPa for M25–M40 — lower than IS 10262 Table 1 assumptions. Use actual plant SD when available